The
kako motako leherketarako makinaorokorrean itxura handiagoa du eta instalazio prozesua ekipo txikiena baino nahiko korapilatsuagoa da. Instalazio zuzena eta probatzeko makina dira ondorengo ekipoen funtzionamendu normala bermatzeko gakoa. Trebatu gabeko hasierako eragiketen kasuan, erabiltzaileek dagokien langileen argibideak zorrotz jarraitu edo argibideak kontsultatu behar dituzte. Baimenik gabe funtzionatzeak atzera bueltarik gabeko kalteak sor ditzake
kako bidezko leherketarako makina. Theshot blasting machine manufacturer has sorted out the precautions for installation and test machine to share with you. I hope it will be helpful to users who use the device for the first time.
1. Installation. The
kako motako leherketarako makina is installed and debugged in the production plant and disassembled into several parts before being transported to the user site for installation. Although there is no pit, the foundation must be firm, the anchor bolt holes must be standardized, and the chamber body must be adjusted. After the second irrigation, the anchor bolt nuts can be tightened after solidification. After the chamber body is fixed, the various parts can be installed. Theprecautions for the installation and debugging of the relevant components are introduced below.
1. Granailatzeko gailua:
Theshot blasting device has been installed on the chamber body before leaving the factory. Please pay attention to the problems to be debugged before use. Check whether the fixed positions of the blade, the pill wheel, the directional sleeve, and the guard plate are accurate and firm, and check whether the direction of rotation is correct after power on. Then adjust the position of the directional sleeve opening. Theoretically, the angle between the front edge of the directional opening and the front edge of the blade throwing position is about 900. After fixing the position of the directional sleeve, the position of the projectile belt can be detected by hanging Place a steel plate or wooden board on the position of the workpiece facing the exit of the shot blasting machine, start the shot blasting machine, put a small amount (2-5kg) of projectiles into the blasting tube, and then stop, check whether the hit position on the steel plate is suitable for the needs, such as Close the window of the bias-adjustable directional sleeve downwards, and vice versa, until it fits, and note the position of the directional sleeve opening as a basis for future replacement of the directional sleeve.
2. Igogailua eta torloju garraiatzailea:
Lehenik eta behin kargarik gabeko proba egin behar da igotzeko ontzia eta kiribileko palak norabide egokian doazen egiaztatzeko, gero estutu polipastoaren gerrikoa tentsio maila ertainera desbideratzea ekiditeko eta ondoren karga proba egin egiaztatzeko funtzionamendua eta garraiatzeko ahalmena, bitxikeriarik dagoen ala ez. Zarata eta bibrazioak, egiaztatu eta kendu oztopoak.
3. Pilula-harea bereizlea:
Lehenik eta behin egiaztatu ahariaren mugimendua malgua den, eta gero egiaztatu bereizteko plakaren posizio egokia, gero palanka kargatu eta arazten denean, altzairuzko jaurtiketak etengabe izaten dira eta egiaztatu altzairuzko jaurtiketak ateratzen eta erortzen diren. kanalizazioa deskargatzen denean